Planning Permission and Permitted Development

Many single-storey rear extensions fall under permitted development and do not require planning permission, subject to size limits. Side and double-storey extensions, and those on properties in conservation areas, generally require a full planning application. Your builder should confirm what applies to your specific property before any other decisions are made.

What to Expect During the Build

A building extension involves groundwork and foundations, structural walls and roof, windows and external doors, insulation to current standards, and internal fit-out including electrical, plumbing if required, and plastering. A well-managed project will have a clear programme of works and a lead contractor who coordinates all trades on your behalf.

Glasgow is the largest city in Scotland and one of the major cities of the UK. The city has reinvented itself from an industrial powerhouse built on shipbuilding and heavy engineering to a vibrant cultural and commercial centre. The Kelvingrove Art Gallery and Museum, the Riverside Museum, and the Burrell Collection are world-class cultural attractions. Glasgow has an excellent food and nightlife scene and was named the UK's friendliest city.

Building Regulations and Structural Calculations

All extensions require Building Regulations approval regardless of whether planning permission is needed. Structural calculations by an engineer will be required for any load-bearing work. Your builder should manage the Building Regulations application and arrange inspections at the required stages of construction.